
Welcome to Atua S lutions

At Atua Solutions we specialise in managing and monitoring lifting operations on various projects on behalf of our clients. Ranging from Demolition to building & Construction, Power Plants, Residential, Commercial Projects.
we and our client can trust our management to always deliver.
Our commitment to the construction industry is prevention of incidents at work place, focus on delivering outstanding services ensuring that Lifting operations plans are well designed & communicated to end users, supervised and adapted to changing risks on activities undertaken.
We deliver Bespoke Risk Assessment, Lifting planning for All mobile Cranes, Telehandlers (Including 360), Tower Cranes (All Types), Crawler Cranes, Spider Cranes ,MEWPS/Scissor Lift, Excavators, Gantry Hoists, at cost guaranteed not to be beaten in the market.



_HEICunit_HEIC.png)
_jpg%203%20Cranes%20corby.jpg)
Professional Services
What We Provide

Meet the Team

Samson Darlington
Director - Atua Solutions Ltd
Prince 2 - Project Management
Appointed Person - A61 Lifting Operations
Almost 2 decades as logistics Manager/AP in building and construction industry, I have noticed little or no communication, lack of logistics on resources crucial to maintaining Safe System of work flow in the Management structure within the construction Lifting team.
Which is why our number priority at Atua Solution is safety for all meaning (Safe Work area, appliances and gears, visitors and environment) Saving our clients tonnes of monies while implementing our clients policies as well as protecting our clie's credibility.
Atua management team ensures that every effort is made to promote high standard Health, safety welfare culture in lifting operations.
Our client ranges from Berkeley Group, DGP Logistics, Interzeit GMBH, MPB Structures Ltd, Countryside Properties, Arc Waterproofing, engineering, demolition,Powerplant and more which has given me broad exposure and experience in BS7121, BS7212,LOLER,BS EN1459 and as per suitable use of lifting equipment.

Countryside Project - Rochester Team
Our excellent lifting team are experienced blue carded Slinger Signallers, Lift Supervisors, Crane operators keeping our client happy with that can do attitude on a 5000 residential new built Homes, Schools and local gymnasium project in Rochester.

Bromford Tunnel Project
Birmingham
Glad to be part of a this great team of Slinger Signallers, Lift Supervisors, Steel Erectors, chippy and concrete formwork specialists.
Lifting plants and equipment in and out of a confined space with multi-tradesmen with residual hazard of Power line.
Incredible Management of health, well-being and safety of the site was of highest Standard by Steve Queen (BBV) and we delivered. .

No matter the load, Our team will get the job done
Live Projects
Contract Lifting


LOLER Inspection
Lifting Plan for Telehandler
Lifting Plan for Excavators
Get a Quote

![IMG_0206[1].PNG](https://static.wixstatic.com/media/995a04_2593e22b37134396b84f4e43b57e67a8~mv2.png/v1/fill/w_588,h_272,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/995a04_2593e22b37134396b84f4e43b57e67a8~mv2.png)





